Skip to content
AirFreight logo with topographic patterns

Hot Shot Trucking
Amarillo TX

Around the clock, HotShotTrucking.com books dedicated trucks for Amarillo shippers and the farm, ranch and energy towns of the Panhandle. A packing line short a gearbox. A wind site waiting on a controller. Steel for a building near the airport. Tell us the load, and a van, box truck, hot shot or flatbed is on its way, same day or overnight.

CALL US AT (512) 828-7766

Hot Shots Courier

Trusted By Our Most Valuable Partners

HOT SHOT TRUCKING AMARILLO

Hot Shot Trucking for an Amarillo Economy Built on Cattle, Aircraft and Energy

Amarillo is the economic heart of the Texas Panhandle. The metro of about 276,000 people serves farm and ranch towns for a long way in every direction. Agriculture still sets the pace. Feedyards across the region finish cattle by the hundreds of thousands, and Tyson's beef plant is one of the largest employers in the city.

The rest of the economy is just as hands-on. Bell assembles the V-22 Osprey tiltrotor here, and Pantex, the nation's main plant for assembling and taking apart nuclear weapons, sits just outside town. Food processing, oil and gas, wind power, health care and a regional retail trade fill out the mix.

Local companies increasingly run on tight schedules and just-in-time inventory, so a late part costs far more than the freight bill. A pump down at a well site or a conveyor stopped on a packing line needs a truck now. It can't wait until a scheduled carrier has room. In a city where one stopped line can idle a whole shift, a dedicated truck is often the cheapest fix.

WELL SITE AND FEEDYARD PARTS hot-shot-truck

Hot Shot Trucking

Most Panhandle hot shot work is heavy and outdoors: a gas compressor, a feed mixer bound for a yard near Hereford, a skid steer for a job site. A heavy pickup pulls the 32 to 40 ft gooseneck or bumper-pull deck, rated for up to 16,000 lbs. Cranes and forklifts load from the side, and machines drive up the ramps.

Learn More about Well site and feedyard parts
SMALL PARTS, BIG DEADLINES icon-sprinter-2-1

Sprinter Vans

A box of bearings for a packing line, a circuit board for a wind turbine, a carton of medical supplies for a hospital lab. The cargo van takes up to 3,000 lbs and is usually the first truck free. If the part is needed in another state, it simply keeps driving.

Learn More about Small parts, big deadlines
STORE AND RESTAURANT RESTOCKS box-trucks

Box Trucks

Panhandle towns shop in Amarillo, so a store that runs low feels it right away. Restocks of up to 5,000 lbs ride in a 12 to 16 ft box truck, sealed against wind and grit, and the liftgate lowers pallets to any back door.

Learn More about Store and restaurant restocks
PLANT DOCK TO WAREHOUSE large-straight-trucks-1

Large Straight Trucks

Food plants and distributors call for this one when a dozen pallets miss the outbound trailer. Its enclosed body is 22 to 26 ft long and rated for up to 9,000 lbs. Choose dock-high for a plant door, or a liftgate for a store.

Learn More about Plant dock to warehouse
A FULL ORDER, NO STOPS 53-ft-dry-vans-1

53' Dry Vans

Reserve the entire 53 ft trailer for one Amarillo order and it goes from your door to the customer's with nothing else aboard. Expect room for roughly 26 standard pallets and a limit of 42,000 lbs. Docks are needed at both ends.

Learn More about A full order, no stops
STEEL, TOWER PARTS, OVERSIZE flatbed-trucks

Flatbed Trucks

Structural steel for a new building, pipe for a field job and machinery too heavy for a gooseneck go on a full flatbed. Amarillo flatbeds run 48 to 53 ft and carry up to 48,000 lbs, loaded from the top or either side. Oversize loads need permits, so send exact dimensions.

Learn More about Steel, tower parts, oversize
Large straight truck on the road
Local detail

Out on the ranch roads

Feedyards, wind sites and well pads often sit miles down a county road. Send the gate code and a pin, and the driver will find it.

Amarillo service area Two counties and the open Panhandle

Pickups across Amarillo and the Panhandle

Amarillo straddles two counties. Potter County holds downtown, the airport and the industrial east side, and Randall County holds the growing south side and Canyon. Interstate 40, the coast-to-coast freeway built along old Route 66, crosses the city east to west. Interstate 27 starts here and heads south to Lubbock.

Pickups happen anywhere in the metro, from east side plants to warehouses near I-27 and Loop 335. Trucks also cover the towns around it, from Canyon and Hereford in the south to Dumas, Dalhart, Borger and Pampa in the north. Freight leaving Amarillo gets a truck from close by, sent straight to your dock. Freight coming in starts at its origin, wherever that is, and heads up the Panhandle without a stopover.

The Panhandle wide-load truck

Anatomy of a Panhandle flatbed

Wind turbine parts, feed mill machinery and steel for a new plant leave Amarillo on a tractor and flatbed like this one. Here is what each part of the rig does for your load.

Side view of a tractor pulling a flatbed trailer

3 / 6Landing gear

  1. Bulkhead

    The wall at the front of the deck. It stops a load from sliding forward toward the cab.

  2. Fifth wheel

    The hinged plate on the tractor. The trailer's kingpin locks into it, and the trailer pivots there in turns.

  3. Landing gear

    Two legs that crank down to hold up the front of the trailer when it is parked without a tractor.

  4. Deck

    The open platform. Freight loads from the sides, from the rear or from above by crane, so its shape matters less than its weight.

  5. Rub rail

    The steel edge of the deck, with pockets for stakes. Straps and chains anchor to it.

  6. Spread axles

    Two trailer axles set wide apart. The spacing spreads a heavy load over more of the trailer.

Workers handling boxes in a warehouse
Before you call

Measure the longest piece

On a flatbed load, the longest and widest piece decides the trailer and any permit. Measure it before you call.

Quotes and cost Why two loads price differently

What goes into an Amarillo truck quote

Four things move an Amarillo price. The first is the truck: a van is the least expensive and a full flatbed the most, so we size it to the freight. The second is the lane. Loads to Dallas or Oklahoma City end where return freight is common, but a remote well pad usually means an empty trip home.

The third is time. Same-hour service, nights and holidays all cost more, because fewer trucks are free. The fourth is the site: security screening at a plant gate, dock waits, tarps, a liftgate or a wide-load permit. Perishables or spare parts, you are paying for one direct trip with nothing else on board.

5.0 from 1,600+ reviews on

Freight stuck on an Amarillo dock? Book the truck now.

Send the pickup, the drop, the weight and the size. We match the truck and keep you posted until it is signed for.

  • Worked with Todd and he made it happen. Called at 9:30am for a hotshot from Dallas to Waller TX. It was offloaded at 4:30pm. Great job!

    Kollin
  • John Mark was a pleasure to work with and kept me updated on the driver's progress as it was an urgent and timely delivery we needed 11 hours away.

    Kenneth

Request a Quote

Step 1 of 3Origin and Destination Info

Amarillo freight hubs

Where Amarillo freight starts, by acreage

Seven freight sites in and around Amarillo, from a federal plant the size of a small county to an aircraft assembly line at the airport. We send trucks to every one of them.

  1. The largest site in the area

    Pantex Plant

    The federal plant northeast of Amarillo where the nation's nuclear weapons are assembled, maintained and taken apart. More than 4,500 people work there, and suppliers deliver to it every day.

    MovesBuilding supplies, equipment, shop parts Pickup noteSecure federal site; follow the delivery rules the site gives you
    About 18,000
    acres
    Supplies and equipment
    what moves there
    US 60
    main road
  2. A planned power and data campus

    Fermi America HyperGrid site

    Land next to Pantex, leased from the Texas Tech University System, where Fermi America plans a large power and data center campus. Its schedule has shifted, so check the current phase before planning a load.

    MovesSite equipment, electrical gear, steel Pickup noteConfirm the active gate and contact first
    About 5,800
    acres
    Construction, power gear
    what moves there
    US 60
    main road
  3. One of the longest runways in the country

    Rick Husband Amarillo International (AMA)

    The city airport has a 13,502 ft main runway. FedEx and UPS sort freight here and send it on by truck and small aircraft across the Panhandle and New Mexico.

    MovesAir cargo, aircraft parts, express freight Pickup noteAirside delivery needs an escort; cargo offices keep set hours
    3,811
    acres
    Air cargo, aviation
    what moves there
    I-40
    main road
  4. Room for the next big plant

    Amarillo East industrial land

    A 622 acre industrial site owned by the Amarillo Economic Development Corporation, outside the city limits but inside its planning area on the east side.

    MovesSite work equipment, building materials Pickup noteRaw land; confirm the access road
    622
    acres
    Development, construction
    what moves there
    I-40
    main road
  5. Texas's first REDI certified site

    CenterPort Business Park

    A rail-served business park owned by the Amarillo EDC near the airport, with two BNSF main lines nearby and Union Pacific service available.

    MovesSteel, machinery, rail-to-truck freight Pickup noteAsk whether the load comes off a railcar
    440
    acres
    Manufacturing, rail freight
    what moves there
    I-40
    main road
  6. Light industry east of the airport

    Eastport Business Park

    A tract of light industrial land on the east side of the airport, beyond CenterPort, marketed in lots for shops, yards and warehouses.

    MovesShop equipment, pallets, building materials Pickup noteLot numbers change; send the street address
    About 300
    acres
    Light industry, warehousing
    what moves there
    I-40
    main road
  7. Where the V-22 comes together

    Bell Amarillo Assembly Center

    Bell's plant at the airport assembles every version of the V-22 Osprey and is set to handle final assembly of the Army's new MV-75. Parts arrive from Fort Worth and other suppliers.

    MovesAircraft parts, tooling, test gear Pickup noteControlled site; book the receiving window
    About 65
    acres
    Aerospace assembly
    what moves there
    I-40
    main road

Trucks by capacity

Weigh it, measure it, match an Amarillo truck

53 ft dry van4 / 6

53 ft dry van side view
53 ft42,000 lbs
53 ft dry van rear view
99 inWide
102 inHigh
Cargo length53 ft
Payload42,000 lbs
Interior width99 in
Interior height102 in
Best for

Full loads, palletized goods, building materials

About 53 ft dry vans

A full 53 ft enclosed trailer reserved for one shipper. It takes about 26 standard pallets. Plan for a dock at both ends.

Price a dry van

Unsure what a CenterPort pickup or a well site run calls for? Give dispatch the weight and size, and they will pick the truck.

Talk to dispatch(512) 828-7766 Get a dry van quote

AMARILLO FREIGHT

Where Amarillo Freight Moves: Two Interstates, a Transcon Railroad and a Long Runway

The Amarillo metro had about 276,000 residents in July 2025, almost 2,000 more than a year earlier. It sits at a true crossroads. Interstate 40 links the city with Oklahoma City to the east and Albuquerque to the west, and Interstate 27 runs south to Lubbock. US 287, US 87, US 60 and US 54 fan out to Fort Worth, Dumas, Hereford and Kansas.

Rail is just as central. BNSF's Chicago to Southern California main line runs through Amarillo, and its line to Lubbock splits off at Canyon. Freight sorted at Rick Husband Amarillo International, with its 13,502 ft runway, goes out on trucks and small planes across the Panhandle and New Mexico.

From an Amarillo dock, a dedicated truck reaches Lubbock in about two hours, and Oklahoma City or Albuquerque in about four. Dallas and Fort Worth are a long half day, and Denver or Wichita a full day.

Weather and road work are the usual delays. High winds and blowing dust can slow tall trailers on open stretches, and winter ice closes roads a few times a year. TxDOT is also rebuilding the Loop 335 interchange with I-27 on the south side, a project set to run from 2026 through 2029.

economy

Interstates 40 and 27 meet in Amarillo, and I-27 runs about 124 miles south to Lubbock.

highway-1

BNSF's Chicago to Southern California main line runs through Amarillo; its Lubbock line splits off at Canyon.

loading-airplane

Rick Husband Amarillo International has a 13,502 ft runway on 3,811 acres, with FedEx and UPS cargo.

airplane-2

CenterPort Business Park, 440 rail-served acres, was the first REDI certified site in Texas.

Amarillo industries we serve

What Amarillo industries rush onto a truck

Here are nine Amarillo industries that book rush freight with us, the loads they send and the trucks that usually carry them. Size and deadline make the final call.

  • Truck stops, dealers and fleet shops

    Automotive

    Amarillo sits where two interstates meet, so its truck dealers, tire shops and repair bays keep long-haul fleets rolling. A rig parked with a bad turbo, or a shop short a transmission, needs the part today, and a van brings it.

    Sprinter vanbox truck

    Learn more
  • V-22 assembly and air cargo

    Aviation & Aerospace

    Bell assembles every version of the V-22 Osprey in Amarillo and will handle final assembly of the MV-75. Pantex sits just outside town. Specialized parts and sensitive materials on a production or security schedule arrive exactly when needed, by enclosed truck.

    Sprinter vanstraight truck

    Learn more
  • Steel, concrete and site gear

    Construction

    New warehouses, plant upgrades and road work keep Amarillo crews busy, from the east side to the I-27 corridor. A crew short of rebar, a beam or a loader part loses the day. Most of it travels on open decks that a forklift loads from the side.

    Hot shotflatbed

    Learn more
  • Feed mills, pumps and packing gear

    Machinery

    Feedyards, grain elevators and packing plants run mixers, augers, conveyors and refrigeration that break at the worst time. The rebuilt unit has to come back fast. Ramps on a hot shot take wheeled machines, and wide loads go flatbed with a permit.

    Hot shotflatbed

    Learn more
  • Beef, dairy and food processing

    Manufacturing

    Tyson's beef plant is one of the largest employers in Amarillo, and cheese and food plants work across the Panhandle. Many run just-in-time, so a missing input or packaging run rides in a van or box truck, and pallets that missed a trailer take a straight truck.

    Box truckstraight truck53' dry van

    Learn more
  • Copper, helium and caliche

    Mining & Metals

    Amarillo was once called the helium capital of the world, and mineral and gas processing still dot the region. When a plant or pit is waiting on one tool, pump or screen, every hour costs money, so the part goes straight out on a deck.

    Hot shotflatbed

    Learn more
  • Panhandle wells and gas plants

    Oil & Gas

    Oil and gas fields ring Amarillo to the north and east. When a pump or compressor fails at a well site, a hot shot brings the replacement fast and cuts the downtime. Pipe and tubing too long for a gooseneck move on a full flatbed.

    Hot shotflatbedSprinter van

    Learn more
  • Servers, wind controls and lab gear

    Technology

    Hospitals, data rooms and the planned power campus near Pantex all depend on hardware that cannot sit in a terminal. Wind farms across the Panhandle add controllers and sensors to the list. It rides enclosed, comes off by liftgate and goes to the install date.

    Box truckSprinter van

    Learn more
  • Fiber, towers and network hardware

    Telecommunications

    Telecom and IT providers in Amarillo still need equipment fast, from networking gear for a business to parts for a tower out on the plains. Cable reels and tower sections go on a deck, while switches and cabinets stay inside a box.

    Hot shotflatbedbox truck

    Learn more

Amarillo freight map

Airports, rail and parks around Amarillo

Find Amarillo's two airports, the BNSF yard and junction, Pantex and the east side parks on the map. Select a pin to read about the site or ask for a quote from it.

Dispatch live 24/7

The map couldn't load. Use the list to see each place.

Watch on YouTube
Picked for hot shot trucking
Episode 2 Jun 22, 2026 24 min

Inside Private Equity's Perspective on the Transportation Industry with Daniel Perry

In this episode, Kevin Carpenter hosts Daniel Perry, a private equity expert from Court Square Capital Partners, to explore how investors evaluate transportation companies for scalability and growth. We delve into what makes a transportation business attractive to private equity, the role of sales and marketing, and how AI is transforming sales processes in logistics.

Amarillo industrial parks

Six parks that load out of Amarillo

Five of these six parks cluster on the east side, between the airport, the rail lines and I-40. The sixth is filling in along I-27 to the south. Each card gives acreage, access and the freight it sees.

  • East Amarillo / near AMA and I-40

    CenterPort Business Park

    Acres
    440
    Rail
    BNSF, UP available

    The Amarillo EDC's rail-served park, with sidings and spurs, interstate access and heavy utilities. In 2024 it became the first site in Texas certified under the REDI Sites program, at the silver level.

    • Manufacturing
    • Rail-served
    • Distribution
    Quote a pickup here
  • East of Amarillo / city planning area

    Amarillo East industrial land

    Acres
    622
    Owner
    Amarillo EDC

    A large industrial tract owned by the Amarillo EDC, outside the city limits but inside Amarillo's extraterritorial jurisdiction. It is held for a large plant or campus.

    • Site development
    • Heavy industry
    Quote a pickup here
  • East side of AMA

    Eastport Business Park

    Acres
    About 300
    Zoning
    I-1 light industrial

    Light industrial land on the east side of the airport, beyond CenterPort. It has been marketed for shops, yards and warehouses that want quick reach to I-40.

    • Warehousing
    • Light industrial
    Quote a pickup here
  • South Amarillo / I-27 and Loop 335

    South Georgia Business Park

    Acres
    195
    Status
    Shovel-ready

    Shovel-ready land on Amarillo's growing south side, close to I-27 and Loop 335. Its position suits freight that serves Canyon, Hereford and the road to Lubbock.

    • Distribution
    • Contractor yards
    Quote a pickup here
  • NE 24th Ave

    Amarillo Business Park

    Acres
    About 55
    Access
    Rail

    An existing industrial and warehouse property on the northeast side, zoned industrial and served by rail. Pallet freight and building products are the usual loads.

    • Warehousing
    • Industrial
    Quote a pickup here
  • 2200 block of D Ave / east side

    Eastport Industrial Tracts

    Lots
    About 1.3 to 13.6 acres
    Use
    Shops and yards

    A subdivided set of industrial lots on the east side, sold separately for small plants, service companies and equipment yards.

    • Contractor yards
    • Light industrial
    Quote a pickup here

Amarillo by the numbers

Amarillo freight, by the numbers

A metro that keeps growing, one of the longest runways in the country, a federal plant on 18,000 acres and thousands of jobs tied to freight. Every figure below lists its source.

Metro · population

276k

People in the Amarillo metro

A gain of about 1,965, or 0.7%, between mid-2024 and mid-2025.1

Main · runway

13,502ft

Length of the main runway at AMA

Runway 4/22 at Rick Husband Amarillo International, on an airport of 3,811 acres.2

Pantex · site

18,000ac

Acres at the Pantex Plant

Most work happens on about 2,000 of them, and more than 4,500 people work there full time.3

Freight · jobs

8,430

Freight-related jobs in the Amarillo district

Freight-dependent businesses produce nearly 40% of the district economy, the Amarillo EDC reports.4

  1. 1 · US Census Bureau, Vintage 2025 estimates, 2025
  2. 2 · City of Amarillo, 2023
  3. 3 · Pantex, 2024
  4. 4 · Amarillo EDC, 2025
Cargo loading at an aircraft
Next step

What to send

Origin, destination, weight, size and deadline. With those five, we can quote.

Request a quote Booking your truck

One call, one truck, out of Amarillo

Freight out of Amarillo ranges from temperature-sensitive food products to oversized industrial equipment. Our job is to match each load with a truck that carries nothing else, and send it direct.

Phone (512) 828-7766 day or night, or fill in the form: origin, destination, weight, measurements and delivery deadline. Your Amarillo expeditor lines up a truck, often in a few hours, and follows it to the signature.

Freight News
Beef processing · Amarillo

Tyson brings back a second shift in Amarillo

Tyson Foods said in November 2026 that it has started restoring the second shift at its Amarillo beef plant, through a partnership with a rancher group called Allied Beef. It expects the shift to be fully running by summer 2027.

Worker in a factory
At a glance · November 2026
1,700
workers affected when the plant went to one shift
2027
when Tyson expects the second shift to be fully running

What Tyson announced

Tyson cut the Amarillo plant to a single shift earlier, a move that affected about 1,700 workers. It is now restoring select second-shift operations and expects the full shift back by next summer, as cattle become available.

Source: Amarillo Tribune, November 2026

Ranchers back the plan

Allied Beef is a group of ranchers and cattle feeders from Texas, Oklahoma, New Mexico and other states. The partnership is meant to steady the supply of cattle to the plant. Tyson has said it will center its beef business on Amarillo and its plants in Holcomb, Kansas and Dakota City, Nebraska.

Freight for a busier plant

A second shift means more of everything: packaging, cleaning supplies, spare parts, knives and maintenance gear. Boxed beef leaves on the plant's regular trailers, but a short part or a late packaging run can stop a line. A hot shot or van can cover that gap the same day. Send the part number, weight and dock hours.

Reviews & customers

Rated 5/5 by the people who ship with us

Excellent · 5.0 out of 5 · 1,600+ reviews on
Sep 2026

Andy Ernst did a great job

Andy Ernst did a great job. He kept me updated on everything and quick responses.

Connor
Sep 2026

Extremely Fast Response Times

John Mark Petersen was incredible to work with, extremely responsive with fast response times. Definitely recommend these guys for all your critical freight.

Anonymous
Sep 2026

First time customer

First time customer. Communication was fantastic throughout the entire process and is sincerely appreciated. Our customer shared an update this morning that the driver texted a little before 5 am that he would be there at 8. That’s exactly when he pulled in. She said it was a much easier process than she ever thought it would be and was very grateful.

Kris
Sep 2026

Excellent service!

We used AirFreight.com for an expedited freight shipment and were very impressed with the entire experience. Their platform made booking quick and seamless, and communication throughout the shipment was excellent. Everything arrived on time as promised, and the process from pickup through delivery was smooth and professional. Excellent service, great communication, and reliable delivery. I would definitely use AirFreight.com again for time-sensitive freight shipments.

Jacob Wohlrabe
Sep 2026

Glad I don't need all the time, but when I do...

AirFreight handled my unusual situation (my perspective) seamlessly. In response to my first call for assistance, a professional (kind, even) HUMAN answered immediately. From there, communication at every stage was clear and thorough. AirFreight is an example of how a service operation is supposed to work.

Ginger B
Aug 2026

Simple, safe and FAST!

AirFreight got our rush job to its destination 3 states away, 800 miles, safe, secure and on time! Jason was very communicative and helpful on the whole journey, we will definitely use them for our rush freight!

JUSTIN
Aug 2026

Zero problems, ahead of schedule

My only criticism is that there isn’t an option for more than five stars. I’ve been burned by more hotshot brokers than I can count, and this is the first time I’ve had a shipment show up ahead of schedule with absolutely zero damage or tampering. I could not recommend AirFreight more strongly, we will be using them exclusively going forward. A bit higher priced but frankly inexpensive compared to the problems caused by prior shippers. 11/10, no notes.

Benjamin
Aug 2026

John was terrific

John was terrific! He worked with me back and forth between the shipper and my local supplier to get us insulation here on time! Thank you very much John!

Wayne
Aug 2026

Jason 5 Stars!

Called Jason at 3:00PM for somehting needing to be picked up by 4:30 and Delivered to Memphis by 6:30 AM He got me booked, picked up and invoice paid all within an hour and a half. Delivery was here at 6:15 that morning. 10/10

James
Aug 2026

Airfreight was quick to respond to my…

Airfreight was quick to respond to my request and was able to provide the hauling of materials we needed very quickly. Easy to work with, kind and helpful. Provided pictures and updates the whole time. I will be happy to work with them again.

Sheila
Jul 2026

The driver had some truck issues &…

The driver had some truck issues & arrived a couple days late but was not a big deal. He went out of his way and jumped through many hoops to be sure he got the load delivered.

Jamison
Jul 2026

Fantastic Service

Everything went very smoothly and wonderful customer service. Very fast!

Dana
Jul 2026

Expedite Load Experience with AirFreight.com

John Mark Peterson was absolutely amazing to work with! He was very persistent to find a driver to get our shipment picked up to get it delivered all the way to Tuscon, Arizona from central Missouri the next day! Not only was the delivery delivered earlier than estimated, the communication was top notch! The cost was also very competitive. The driver was very professional and knew his job well. I can't express enough how pleased we are with the service we received! Keep up the good work AirFreight!

Jesse Simpson
Jul 2026

We used the same day courier service

We used the same day courier service. Andy Ernst helped us set it up. He was extremely helpful and put everything together at a moments notice. Exceptional customer service!

Aaron
Jul 2026

AirFreight was very professional and prompt

AirFreight was very prompt, accommodating, professional, and timely with zero issues.

Mark
Jul 2026

AirFreight came through and got us out…

AirFreight came through and got us out of a bind. Steve Jannsen was amazing. He went above and beyond to assist me with a quote, booking and tracking. This was our first time using AirFreight to get a Same Day delivery and it was handled effortlessly and delivery got there earlier than expected. I will be keeping Steve's info on hand for any future needs.

Tina
Expeditor Chris at the airport

“I had a single point of contact assigned to our shipment that was fantastic on keeping me updated every step of the way.”

Pamela · Trustpilot
HowWe Work

One Person, Start to Finish

When you call HotShotTrucking.com about an Amarillo load, a real person answers and stays with it. That expeditor books the truck, confirms the pickup window and handles any change until the signed delivery. If the delivery moves or the dock changes, you call the person who already knows your shipment.

  • One contact from quote to delivery
  • Pickup and delivery windows confirmed
  • Changes handled by the same person
Expeditor Andy

“I called up at 7:30 pm... one that was secured cancelled at the end of the day. Todd quoted three shipments on the spot... The last shipment was picked up at Midnight.”

Susan · Trustpilot
WhatWe Provide

The Right Mode, Every Time

We start with your dimensions, weight and both addresses. That tells us whether the load needs a Sprinter van, a box truck, a gooseneck hot shot or a full flatbed. If a site has no dock, we add a liftgate. If the load is oversize, we plan for the permit. You get one quote for the truck that fits.

  • Truck sized to your freight
  • Liftgate added when there is no dock
  • Oversize loads planned with permits
Expeditors Steve and Todd

“True to word. They did exactly what they said they would do.”

Dan · Trustpilot
WhoWe Are

Honest With You, Always

An urgent load is stressful enough without missing part of the picture. You see the price before you commit and the arrival time as it actually stands. If traffic or weather affects the route, you hear it from us first, with a plan. Dispatch is available around the clock.

  • All-in quotes before you commit
  • Delays reported early
  • Dispatch around the clock

Get a quote

Start an Amarillo quote

Give us the pickup, the drop and the deadline, and an Amarillo expeditor books the truck and tracks it to delivery.

5.0 from 1,600+ reviews on

Request a Quote

Step 1 of 3Origin and Destination Info

Called at 9:30am for a hotshot from Dallas to Waller TX. It was offloaded at 4:30pm. Great job!

Kollin · Verified review on Trustpilot

Amarillo Hot Shot Trucking FAQ

How soon can a truck reach my Amarillo pickup?

Usually the same morning or afternoon you call. Vans and box trucks are plentiful in Amarillo and tend to arrive first. Hot shots and flatbeds book up faster when the oilfield is busy. You get a firm pickup time, and a call if it slips.

Can an Amarillo load reach Lubbock, Oklahoma City or Albuquerque the same day?

Yes, for most of the region. Lubbock is two hours down I-27, roughly 120 miles. Oklahoma City, about 260 miles east, and Albuquerque, about 285 miles west, are each around four hours on I-40. Dallas and Fort Worth, past 350 miles, work as same-day trips if the truck is rolling by late morning.

How much can an Amarillo hot shot gooseneck carry?

Plan on a 32 to 40 ft deck, either gooseneck or bumper-pull, towed by a one-ton or larger pickup. Payload tops out near 16,000 lbs for most rigs, set by each truck and trailer's combined weight rating. A compressor skid, a feed mixer or a small tractor fits. Anything wider than the deck, or heavier, goes on a full flatbed under permit.

Hot shot, box truck or Sprinter van: which fits my Amarillo freight?

Weight first, then how it gets loaded. Under 3,000 lbs and needs to stay clean, like a circuit board or a carton of bearings? That is a Sprinter van. A box truck takes up to 5,000 lbs and a straight truck up to 9,000, and many carry liftgates. Machines too big for a box ride a hot shot deck.

How do I check the carrier on my Amarillo load in FMCSA SAFER?

Your expeditor can give you the carrier's USDOT number, plus an MC number for interstate loads. Type it into the Company Snapshot search on FMCSA's SAFER site. Check that the legal name matches your bill of lading and that the status says authorized. Insurance and inspection records show there too. Treat any surprise email changing the pickup with suspicion, and confirm by phone.

Do you pick up in Canyon, Hereford, Dumas or Borger?

Yes, all four, plus the rest of Potter and Randall counties. Trucks run to Canyon, Bushland and Hereford on the south and west, Dumas and Dalhart up north, and Borger, Fritch, Pampa, Panhandle and Claude to the northeast and east. Feedyards, wind sites and well pads are fine too.

Can a truck deliver to Pantex, the airport or a secure plant gate?

Yes. Pantex, airport cargo buildings, the Bell plant and food plants each set their own check-in, hours and driver rules. Tell us the gate or building, who meets the driver and what documents the site expects. The arrival is timed to their receiving window.

Can I book an Amarillo pickup on a weekend or holiday, and does it cost more?

You can, any day of the year, and a person answers. Prices can run higher at night, on weekends and on holidays because fewer drivers are working. In winter, an ice storm on I-40 can strand trucks for a day, so book as soon as a front shows in the forecast.

What do you need from me for an Amarillo quote?

Start with pickup and delivery addresses, ZIP codes included. Add weight, measurements and how many pieces. Tell us how it goes on and off the truck: dock, forklift, crane, liftgate or hand. Give the ready time and the deadline, and mention hazmat, fragile or oversize items. Shipping a gearbox to a ranch shop without a dock? Say so and we quote a liftgate.

When does hot shot beat LTL or a full truckload for Amarillo freight?

Pick hot shot when the freight is urgent, heavy or oddly shaped, and nowhere near a full 53 ft trailer. Nothing waits to be consolidated, and nothing stops at a terminal. LTL suits a few pallets that can take several days, and full truckload suits a full trailer. Coast-to-coast deadlines can also go by air freight.

What Amarillo freight goes hot shot most often?

Oilfield pumps and compressors, packing plant and feed mill parts, steel and materials for job sites, and parts for wind turbines. Aircraft parts and tooling, store restocks and pallets that missed their scheduled truck come up often as well.

Does HotShotTrucking.com serve other Texas cities?

We do. HotShotTrucking.com also has trucks working out of Lubbock, Wichita Falls, Abilene, Midland, Fort Worth and Dallas. Amarillo loads can go anywhere in the lower 48.

I'm an owner-operator near Amarillo. Can I haul loads for you?

We mostly hear from shippers here, but Panhandle drivers ask too. To haul for hire you need your own authority or a lease onto a carrier, and insurance. Amarillo freight leans toward oilfield parts, farm equipment and steel, so a gooseneck with ramps earns its keep. Weekly pay ads often skip empty miles and costs, so read them closely. Carriers interested in Amarillo freight can call (512) 828-7766.

CTA Hero Star Background
TOP